<p>66-75正确答案<br/>DCABD CCBDB</p><p>66.()from one phase are usually reviewed for completeness and accuracy and approved </p><p>before work starts on the next phase.<br/>A.Process B.Milestone C.Work D.Deliverables<br/>repair answer D</p><p>67.Organiztions perform work to achieve a set of objectives.Generally,work can be </p><p>categorized as either projects or operations, although the two comtimes ()<br/>A.confused B.same C.overlap D.dissever<br/>repair answer C</p><p>68.In the project management context,()includes characteristics of </p><p>unification,consolidation,articulation,and integrative actions that are crucial to </p><p>project completion,successfully meeting customer and other stakeholder requirements,and </p><p>managing expectations.<br/>A.integration B.scope C.process D.charter<br/>repair answer A</p><p>69.Project () Management includes the processes required to ensure that the project </p><p>includes all the work required,and only the work required,to complete the project </p><p>successfully.<br/>A.Integration B.Scope C.Configuration D.Requirement<br/>repair answer B</p><p>70.On some projects,especially ones of smaller scope,activity sequencing,activity </p><p>resource estimating,activity duration estimating,and ()are so linked that they are </p><p>viewed as a single process that can be performed by a person over a relatively short </p><p>preriod of time.<br/>A.time estimating B.cost estimating C.project planning d.schedule development<br/>repair answer D</p><p>71.In approximating costs,the estimator considers the possible causes of variation of </p><p>the cost eatimates,including().<br/>A.budget B.plan C.risk D.contract<br/>repair answer C risks.</p><p>72.Project Quality Management must address the management of the project and the () of </p><p>the project.While Project Quality Management applies to all projects,regardless of the </p><p>nature of their product,product quality measures and techniques are specific to the </p><p>particular type of product produced by the project.<br/>A.performance B.process C.product D.object<br/>repair answer C</p><p>73.()is a category assigned to products or services having the same functional use but </p><p>different technical characteristics. It is not same as quality.<br/>A.Problem B.Grade C.Risk D.Defect<br/>repair answer B</p><p>74.Project () Management is the Knowledge Area that employs the processes required to </p><p>ensure timely and appropriate generation,collection,distribution,storage,retrieval,and </p><p>ultimate disposition of project information.<br/>A.Integration B.Time C.Planning D.Communication<br/>repair answer D</p><p>75.The () process analyzes the effect of risk events and assigns a numerical rating to </p><p>those risks.<br/>A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk </p><p>Monitoring and Control.<br/>repair answer B</p> |
|